logo
afiş
Haber Detayları
Created with Pixso. Ev Created with Pixso. Haberler Created with Pixso.

Mali Client Tours Running Track Adhesive Plant as His 13,000 m² Order Is Loaded into Three Containers

Mali Client Tours Running Track Adhesive Plant as His 13,000 m² Order Is Loaded into Three Containers

2026-11-27

A Mali Client at the Running Track Adhesive Plant

On 19 November 2026, a sports facility contractor from Mali visited the factory where the adhesive for his running track is produced. His order for 13,000 m² of athletic track was in production, and the plant happened to be loading containers that same week — so the day covered both the production line and the loading yard.

What the Visit Covered

The visit combined a plant walk-through with a technical briefing. Our management team met the client on arrival, and the conversation moved quickly from commercial topics to process detail.

  • Incoming raw materials — PU binder, EPDM and SBR granulate
  • Mixing and dosing control — accuracy of the binder ratio
  • Production equipment — reactors, mixing lines and the packing station
  • Quality control — batch testing and records before dispatch

Inside the Plant

The client walked the full line: raw material storage, the mixing area, the filling and packing station, and the QC bench where every batch is checked before it leaves. Our engineers explained the chemistry in plain terms — what the binder does, why the mixing ratio cannot be trimmed to save cost, and what happens to a track when it is.

The Loading Yard

Loading happened to fall on the same day, which gave the client a view of the whole chain in a single visit: binder mixed and packed in the morning, drums and bags staged on the floor, and the containers filled in the yard.

Photographs and video were taken throughout the day, and the client filmed the packing and loading himself — the kind of material a buyer can put in front of his own board and his installation contractor.

The Technical Discussion

Mali's climate is hot, dry and dusty for most of the year, with a short and intense rainy season. That drives the specification towards a porous spray coat system, which drains through the surface and tolerates high surface temperatures, rather than a non-porous build-up that depends on a perfectly drained base.

Two points our engineers explained in detail:

  • The binder ratio is not negotiable. Cutting the PU content lowers the price per square metre and shortens the life of the track — the first symptom is granulate loosening at the edges.
  • Base preparation decides the outcome. A track is only as good as the asphalt or concrete beneath it; curing, compaction and crossfall matter as much as the surface material.
Project snapshotDetail
ClientSports facility contractor, Mali (West Africa)
Visit date19 November 2026
Facility visitedRunning track adhesive / PU binder plant
Order scope13,000 m² of athletic running track
ShipmentThree containers, loaded during the visit

What the Client Took Away

The client left with production records, batch information and his own photographs of the line — the kind of documentation that supports a tender submission back home. For us, the day was a reminder that a factory visit works best when it is simply a day at work: the line was running because there was product to make, and the containers were loaded because the order was ready to ship.

About Flyon Sports

Flyon Sports manufactures athletic running tracks, portable event flooring, retractable bleacher seating and outdoor metal bleachers for stadiums, schools and event venues, and has installed facilities in more than 20 countries. Clients are welcome to visit our factories — adhesive plant, granulate production and track assembly — at any stage of a project.